Citation-Backed Specification & Submittal Intelligence

Division 21–28 MEP Specification & Submittal Auditing

Automated First-Pass Spec Triage — Built for Preconstruction & MEP Estimators.

Citation-backed specification intelligence for estimator-led review across fire protection, plumbing, mechanical, controls, electrical, communications and security packages. Triage exclusions, rating mismatches and unanswered scope questions with Master Spec and Vendor PDF citations side-by-side, then verify the evidence before locking a bid or issuing a PO.

Replace hours of manual Ctrl+F reading with a 60-second first pass across 100+ page spec sections and vendor quotes. Review exact [PAGE], section and paragraph citations side-by-side, then verify the source documents yourself. SpecWyse does not replace the estimator or Engineer of Record (EOR); your team owns every bid and approval decision. Dollar risk benchmarks are indicative, not vendor prices.

No Black-Box Guessing — 100% Verifiable [PAGE] Citations

Every flagged exclusion, deviation, and dollar risk benchmark is tagged with the exact [PAGE] and paragraph citation in both your Master Spec and Vendor Quote so your team can verify every finding in seconds.

Division 21 — Fire Suppression

Compare quoted fire suppression equipment, accessories, testing and installation scope against the supplied specification. Flag missing required certifications, scope exclusions and unclear vendor commitments for review.

Division 22 — Plumbing

Review specified piping materials, pressure ratings, fixtures, pumps and accessories against vendor documents. Identify material substitutions, missing components and excluded testing where the master spec requires them.

Division 23 — HVAC & Liquid Cooling

Check chillers, CRAHs and liquid cooling CDUs for specified capacities, glycol conditions, redundancy, voltage and controls requirements. Surface vendor derates and exclusions with citations to the supplied documents.

Division 25 — Integrated Automation / BMS / EPMS

Compare required BACnet/IP, Modbus TCP, gateways, point mapping and integration scope with the vendor's stated offering. Keep protocol support and BMS or EPMS integration commitments distinct so missing scope is visible.

Division 26 — Electrical, Switchgear & UPS

Review switchgear, UPS and distribution packages for interrupting ratings, enclosure requirements, bus materials, arc resistance, accessories and testing. Flag technical substitutions and buried exclusions before they enter a bid or purchase order.

Division 27 — Communications

Compare specified fiber, copper cabling, racks, pathways and communications equipment with vendor scope. Review stated performance, accessories and testing against the actual master specification.

Division 28 — Electronic Safety & Security

Check fire alarm, access control, surveillance and related safety or security packages for specified equipment, interfaces, certifications and testing. Draft clarification requests when vendor documents leave required scope ambiguous.

One estimator-led, source-grounded MEP review workflow

Choose your CSI scope and Pre-Bid Quote or Post-Award Submittal mode, then run an automated first pass across the Master Spec and Vendor PDF. Verify [PAGE], section and paragraph citations in the matrix, review indicative financial risk and refine editable vendor RFIs. Paid access unlocks full findings and report exports; the free teaser shows up to three prioritized actionable findings.

SpecWyse does not replace the estimator or Engineer of Record. Findings and indicative costs support triage, not engineering approval or quoted prices. Your team verifies requirements, vendor commitments and final decisions.