Citation-Backed Specification & Submittal Intelligence
Division 26 Electrical Submittal Review Software
Automated First-Pass Spec Triage — Built for Preconstruction & MEP Estimators.
Give electrical estimators a citation-backed first pass across Division 26 switchgear, UPS, generator and distribution packages. Review potential short-circuit shortfalls, oversizing exclusions, seismic gaps and buried controls exclusions against the Master Spec and Vendor Quote side-by-side before carrying a number in your bid.
Replace hours of manual Ctrl+F reading with a 60-second first pass across 100+ page spec sections and vendor quotes. Review exact [PAGE], section and paragraph citations side-by-side, then verify the source documents yourself. SpecWyse does not replace the estimator or Engineer of Record (EOR); your team owns every bid and approval decision. Dollar risk benchmarks are indicative, not vendor prices.
No Black-Box Guessing — 100% Verifiable [PAGE] Citations
Every flagged exclusion, deviation, and dollar risk benchmark is tagged with the exact [PAGE] and paragraph citation in both your Master Spec and Vendor Quote so your team can verify every finding in seconds.
Switchgear & Generator First-Pass Spec Triage
Review cited switchgear and generator ratings, accessories and testing requirements against the vendor's stated offering. Your estimator verifies each potential gap; the EOR retains final engineering review.
- 25% generator oversizing requirements excluded from the quote
- PE-stamped seismic restraint calculations and hardware excluded
- Enclosure, bus material and arc-resistance deviations
- Factory testing and startup scope gaps
kAIC Rating & BMS Gateway Exclusion Checker
SpecWyse flags 100kA vs. 65kA short-circuit shortfalls where the vendor's interrupting rating falls below the specified kAIC, and catches buried Modbus TCP/BACnet gateway exclusions that leave BMS and EPMS integration unpriced across Division 26 packages.
Source-Cited Review — No Sales Demo Required
Open the workspace, load a Division 26 sample or upload your own spec and quote PDFs. In about 60 seconds, review a citation-backed matrix, indicative risk benchmarks and draft RFIs. Verify source evidence and pricing before issuing a bid or PO.